AS9102 FORMS PDF

Finance

AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.

Author: Tam Nacage
Country: Mali
Language: English (Spanish)
Genre: Business
Published (Last): 4 July 2014
Pages: 304
PDF File Size: 8.16 Mb
ePub File Size: 8.83 Mb
ISBN: 723-8-96450-262-3
Downloads: 61151
Price: Free* [*Free Regsitration Required]
Uploader: Doukazahn

Finally, characteristic accountability evaluates verification and compatibility.

With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it. These measures help guarantee repeatability of the production of these products. This new revision was meant to consolidate multiple requirement forms as well as improve the process and organization of these forms.

  BIOGAS DARI RUMPUT LAUT PDF

If something goes wrong in the process, the company can look back at the documentation to see exactly which part he needs to change. The part number accountability form designates specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing process.

Requirements for AS With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.

There are several advantages to companies adhering to this new a9s102.

Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool. Examples of optional information include the name of the person who prepared the FAI, the name of the person who approved the FAI, the date FAI is reported, and the name of the customer corms approved everything.

  LUTZEN 1632 PDF

The three AS forms are: Filling out and tracking these forms help companies ensure validity and reliability when introducing new parts. This form lists all the characteristics of the part, including characteristic requirements and corresponding inspection results. This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods.

The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields. Next, fforms accountability includes citation of raw material specifications, special processes, and functional testing. Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.